Well this week we have managed to get the axle squared up and bolted tight. The 4 bars are all set to the correct length, the triangular track locator bar is in place and set to the correct length. We have also fitted the lower cross brace between the suspension mounting plates. Also the rear mudguard brackets are in place.
Another job we have managed to get done is fitting the twin air tanks along with the water trap's and run most of the air lines.
The list is getting smaller
Sent from my moto e13 using Tapatalk