by Welder64 » Fri Jul 29, 2022 9:47 am
finally finished cutting the crap out of the N/S step and inner wheel arch and inner and outer sill, started to offer up panels that i have cut to size to ensure a neat finish, just waiting on the inner wheel arch splash panel to turn up so i can dummy fit with the other panels before welding. I guarantee if i just went ahead and welded before i joggled all the panels into some thing will look mis aligned. Lots of surface rust to be treated before i weld in new panels and box in that section
You do not have the required permissions to view the files attached to this post.