here's the van as i bought it


The first thing i did when i got the van was investigate the front arches ,big mistake i poked both sides with a screwdriver and both disintegrated into a pile of dust .so new inner and outer arches plus new front wings were ordered ,there is also rot in the floor of the cab on both sides and both steps plus both sills all need repairing so plenty to keep me busy
here is the van all stripped down ready to start cutting the rot out




i had new inner arch/wing panels but when it came to fitting them i realised there was nothing to attach them to as the panel has completely rotted away so i cut a piece of tin to shape and welded that into place before welding the inner arch
to it ,then it was on to the outer arch and finally the wing all done in one saturday afternoon


the next picture is of the panels dry fitted

and then welded in place i haven't done alot of welding before so its not perfect but since buying this van its come a long way lol

then patched the sill up as it was quite solid just one whole in the top and in the picture you can see the next bit to do (the step and the massive whole in the floor

as you can see there is still much to do in the cab etc but last week i found on ebay a beaver tail body (very cheap) as it was off a crew cab so very short but i bought it anyway on the idea that its probably easier to extend this body than start from scratch building a new one
putting on the chassis extensions to take the body

then lifted the body on and bolted it down, i still have to put two braces between the back of the chassis and the beaver tail and i need to extend the bed about 18 inches to meet the back of the cab but i still think it was easier than starting from scratch here it is on the truck i will take it off when its finished so i can paint it all properly then bolt it back on


i got the floor welded up on one side yesterday and also managed to plate the step up but forgot to take pics so will take some on sat and post my progress next sunday ,then hopefully i can make some real progress over christmas as have two weeks off can't wait








