

Jim Archer wrote:Chock rear wheels securely -there is going to be a fair bit of levering of this going on - and jack up front under subframe as high as you can and sit it on blocks.
Wheel off.
Jack up outer end of wishbone to take the weight.
Remove the 3 bolts and slide bottom ball joint from wishbone. Tie the leg back out of the way unless you want to keep hitting your head on it.
A willing and hefty assistant is useful for this bit - using a big levering bar and plenty of swearing, force the wishbone down and pull spring and it's rubber buffer cap thingy out of top housing.
Swap rubber dodad onto new spring and refit into top housing, make sure to get the bottom tail in the wee location notch in wishbone.
Jack wishbone back up and refit bottom ball joint.
Job done.
Have the tracking checked - if it was tracked with a broken spring then the tracking man wants the broken spring inserted up his botty - but it rarely needs doing as the ball joint bolts are a pretty good location fit in wishbone and joint end.
Dragging dirt bikes up farm tracks and the like around you soon get used to doing it.![]()
HTH
Jim


Return to Mk 3, 4 & 5 - Second Generation Transits
Users browsing this forum: No registered users
This site contains affiliate links for which we may be compensated.