the engineers have decided to make the middle bit in 2 half's a top and a bottom
as it would be difficult to get in and out as one piece.
bottom angle frame with half a sheet of 12mm ply in it
that bits already made and in the the van

..except it needs paint and ply
...
and a top half to match the rest of the caging angle frame with 19mm tube at 75mm ish gap
under construction.....
luckily I bought about 5 metres too much tube for the back door still need a bit more though
