The base vehicle, a 2008 MWB high roof 140 T280

First job, remove bulkhead. What a pain that was, quite a few stuck/threaded bolts that needed drilling out.

With bulkhead out.

Ply all stripped out, and given a clean.

Batons in on floor.

Insulation going in.

Floor complete.

Next job is to put some windows in. Think I may leave that to someone else





















