jobs done so far:
sealed body window
replaced rotten mdf wall above sink
secured back door hinges
fitted shower
sealed windscreen leak
some painting, filling, cleaning etc
repositioned speakers
back door draft reduced
to do
fit another leisure battery and pure sine inverter (1200w)
repair mdf wall under sink
get window winders working (i have to pull over to do them up
treat rust,
rebuild bottom drivers door
prime and paint
get water boiler and fridge working
she is in for a service at the moment with clunking brakes and grinding bearings as well as a drivers door that flies open on most left hand turns